Free HSE template · JSA / JHA Forms
Electrical JSA Template
The electrical JSA template is the JSA aimed at the electrical work: the isolation and the lockout-tagout, the arc-flash assessment and the PPE, the test-before-touch, and the step-by-step controls for the job. Electrical is the hazard where the step order is the safety, and the template keeps the sequence in the order the work has to happen.

Electrical JSA — the LOTO sequence, built in
The fixed electrical steps — the isolation, the try-out, the test-before-touch — as lines, with your job steps around them. The sequence is the safety.
| # | Step | Hazard(s) | Control | L | C | Score | Done? |
|---|
It carries the electrical-specific steps as fixed lines — the isolation, the try-out, the test-before-touch, the arc-flash PPE — so the assessor adds the job-specific steps around them. Fill it in for the job, score the steps, sign it, and carry it on the job. The worked example is a panel maintenance JSA with the LOTO sequence worked through.
How to use the template
- Set the header — the job, the panel or circuit, the date, the preparer
- Work the fixed electrical steps — the isolation, the try-out, the test-before-touch
- Add the job-specific steps around them, one clear action each
- Record the arc-flash assessment and the PPE for the arc rating
- Score each step; the high steps are the isolation and the test-before-touch
- Sign it, brief the crew, carry it on the job, and file it with the isolation record
Worked example
A panel maintenance JSA: step 1 identify the source and the rating (the arc-flash assessment, the PPE selected), step 2 isolate and lock out (the LOTO, the try-out), step 3 test before touch (the voltage tester, the proof), step 4 work on the de-energised panel (the insulated tool), step 5 re-energise in the sequence (the crew clear, the removal of the lock). Five steps, the sequence is the safety, the sign-off by the electrician.
Standard & legal context
The electrical JSA carries the OSHA electrical standards (1910 Subpart S) and the NFPA 70E arc-flash practice in the US, and the Electricity at Work Regulations 1989 and the IET practice in the UK. The lockout-tagout is the OSHA 1910.147 control, and the test-before-touch is the NFPA 70E and the HSE good practice. The 5×5 scoring per step is the ACoP L80 convention, and the template is the JSA with the electrical sequence built in.
Common mistakes
- Skipping the try-out — the isolation is not proven until the try-out, and the step is in the template for a reason
- No test-before-touch — the voltage tester is the proof the panel is dead, and the step is the one that saves the life
- PPE as the first control — the arc-flash PPE is the last layer; the isolation and the de-energise are the ones that remove the arc
- Re-energising before the crew is clear — the final step is the sequence, and the JSA carries it so it is not skipped
Need the sign-off, not just the template?
The template is the preparation; the sign-off is the professional. For the statutory assessments, the audits, the ISO 45001 implementation and the training that comes with them, ask Muhammad Umer — 8+ years across Iraq, KSA and Pakistan, and the programme runs through umer-hse.pro. One message gets the written scope.
Common questions
Electrical JSA Template — answered
What is an electrical JSA template?
The JSA aimed at the electrical work: the isolation and the lockout-tagout, the arc-flash assessment and the PPE, the test-before-touch, and the job-specific steps around them. It keeps the electrical sequence in the order the work has to happen.
How is it different from the standard JSA template?
The standard JSA is the blank step table; the electrical JSA carries the fixed electrical steps — the isolation, the try-out, the test-before-touch — as lines, so the assessor adds the job steps around a known-safe sequence. Same method, electrical sequence built in.
Does it cover lockout-tagout?
Yes — the LOTO is a fixed step with the try-out, and the re-energise step carries the removal of the lock in the sequence. The JSA is the companion to the isolation record, and both are filed together.
Does it cover the arc flash?
Yes — the arc-flash assessment and the PPE for the arc rating are steps, and the NFPA 70E practice is named in the standard section. The PPE is the last layer; the isolation is the control.
Can I use it in the UK and the US?
Yes — the UK carries the Electricity at Work Regulations 1989 and the IET practice, the US the OSHA 1910 Subpart S and the NFPA 70E. The template is the JSA with the sequence, and the standard section names both.
Can I print or export it?
Yes — Print / Save as PDF gives the document to carry on the job, and Export CSV gives the steps for your file. The worked example is a panel maintenance JSA with the LOTO sequence.
Keep building
Related templates
JSA / JHA Template
Free JSA template (job safety analysis / job hazard analysis): the steps, the hazards, the existing controls,
Toolkit toolPermit To Work Checklist
Working HSE tool from the toolkit
Toolkit toolElectrical Safety Inspection
Working HSE tool from the toolkit
THE HEALTH AND SAFETY is an education and knowledge network. The templates are free and open; the professional assessments and audits run through umer-hse.pro.
Safety disclaimer
These templates are practical documents, built to the UK baseline with the US equivalents named on each page. They do not replace a competent person assessment for high-risk work, a statutory assessment, or the advice of your insurer. Where a document has legal force — the fire risk assessment, the COSHH register, the permit to work — the responsible person owns it. Use the template as the preparation, and the competent person as the sign-off.
